Job Information
Home / Structure Information
Active Scope Items
0Check all items that apply to this job. Then configure each on its tab.
Cost Summary
Lumber
$0
Aluminum
$0
Labor
$0
Concrete
$0
Electric
$0
Fees
$0
Misc
$0
Custom Work
$0
Total Cost
$0
Margin
$0
Sale Price
$0
Concrete Total
$0
Applied as % markup on cost. Default: 60%
Per-Item Breakdown
| Item | Alum | Lumber | Labor | Misc | Cost | Margin | Sale Price |
|---|---|---|---|---|---|---|---|
| TOTAL | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Skirting Configuration
Skirting Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Steps Configuration
Steps Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Carport Configuration
Carport Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Factory Screen Room
Factory screen rooms use fixed sale prices: Full = $4,600 / Half = $3,400. These can be changed in Settings.
Ground Level Screen Room
GL Screen Room Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Shed / Garage Configuration
Shed/Garage Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Access Doors
Access Door Material List
| Item | Dim | Price/Unit | Qty | Cost $ | Sale Price $ |
|---|---|---|---|---|---|
| Totals | $0.00 | $0.00 | |||
Gutters (Standalone)
Gutter rates are set in Settings. Default rate includes material + labor per LF.
Concrete
| Item | Unit | Price | Qty | Cost |
|---|---|---|---|---|
| Concrete Total | $0.00 | |||
Engineering, Permit & Survey Fees
Electric
Miscellaneous & Custom Work
| Description | Qty | Unit Price | Cost |
|---|
⚙️ Pricing Settings
Edit any price and click "Save Settings". Changes apply immediately to all calculations.
⚠️ Known Data Flags from Original Spreadsheet
| Location | Issue | Fix Applied |
|---|---|---|
| Summary & CP Elite – Roof Sq Ft | #DIV/0! | Shows 0 when dimensions not entered |
| Breakdown rows 737–738 – Double Access Door | #REF! | Fixed: uses correct $100/ea labor, $50/ea trip |
| Concrete – Job Location | #N/A | Fixed: dropdown selection instead of VLOOKUP |
| CV / Lap – Square Feet | #N/A | Fixed: shows 0 when inputs are 0 |
| Install / Cust / Addendum – Dates | 1/0/1900 | Fixed: date pickers default to today |
| Contract boilerplate | Typo: "voilation" | Fixed: "violation" |
| Concrete – Raised Shed Floor N. Port | $5.50 vs Estero $13.20 | ⚠ Kept as-is; verify with sub-contractor |
| Concrete – Footings N. Port | $16.50 vs Estero $33.00 | ⚠ Kept as-is; verify with sub-contractor |
➕ Add Custom Scope Items
Add new line items that will appear in the Misc/Custom section and roll into the summary.